Logo
A

Arvind Techno

219 employees

Arvind Techno was first incorporated in 1978 and over decades has executed projects in civil construction primarily focusing on Bridges / Flyovers of varied size and scale. Arvind Techno’s core expertise and experience is in Bridge / Flyover construction with modern art methodologies and best technical expertise in the segment. With 75+ completed projects and multiple ongoing projects, we retain our focus on Bridges / Flyover projects; strive to keep building safe, sustainable and quality infrastructure and carve-a-niche in the Bridge Infrastructure industry. Key Achievements : • First to adopt Segmental Construction and erection using Launching Girders in long River Bridges. • First to handle of Well Caisson under River depth of more than 18 meters. • Commissioning of a 500 RM Interchange as part of Yamuna Expressway consisting of more than 1200 nos. PSC Girders in merely 8 months. • Successful completion of cross over elevated sections in DMRC Phase 3 at height of 24 meters. • First in India to adopt Pile Foundation in Ganga Bridge. • First company in India to complete the longest Extradosed Bridge of 2.2 KM 2 Lane with a maximum span of 144 meter. • Longest Bridge of 3 KM in entire DFCC (Eastern and Western) • One of India’s most experienced company in Well Foundation – Maximum 3700 RM of Well Sinking in one project, Well Caissons of more than 18 meter depth and 18 m X 8 m Double D Wells. • Globally fastest Execution of India’s first 8 lane and Longest multiple span Extradosed Bridge, with 510 m continuous span over River Narmada in a record 34 months. • Completed the Longest Creek Bridge of 1 KM in Andaman and Nicobar Islands • Fastest in Industry Execution of 1.6 KM viaduct with 45 meter long piers as part of more than 4 KM Elevated Mopa Airport Link project in Mopa, Goa (under progress)

Basic info

Industry

Civil Engineering

Sectors

Civil Engineering

FAQ