B

BACS Riyadh Metro Project

772 employees

BACS Riyadh Metro Project designs and builds Lines 1 and 2 of the Riyadh metro network with a total length of 176 KM with 85 stations.

Basic info

Industry

construction

Sectors

Bridges
Metro Rail
Stations
Construction
Railroad
Tunneling
Conracting

Date founded

2013

FAQ