Logo
D

Doha Metro Red Line South Joint Venture Project

77 employees

The contract, with a value of about QAR 7.5 billion, covers design and construction of a dual-tube underground line with a length of 13.8 kilometers between the Doha airport and the Msheireb neighborhood in the historic center of the Qatari capital.Average depth of 25 meters below ground level utilizing five tunnel boring machines. The maximum depth point will approximately reach 50 m below ground level.

Basic info

Industry

Construction

Sectors

Construction

FAQ