Faboula Gold SA operates the Kodiéran gold project, located in southern Mali, approximately 300 km South of the capital, Bamako. Kodiéran comprises a high-grade open pit mining operation, and a processing circuit with a nominal capacity of 10,000 tons/day. Production started in 2017.
2002